4. Part


When you select Ryman Composites to assist or manage your project, depending on your stage of development you can engage with us at any phase of the process.

Our project map starts with design and works through the other stages. See below for the Part Production through to Assembly Storage and Distribution Component stages that we believe should be considered and incorporated into a complete project flow:

Work from this stage assumes that a production quality and production ready mould exists.

Production Prototype

    • Trial Laminate Schedule 
    • Insert location 
    • Reinforcement location 
    • Jig Design 
    • Production 
    • Testing 
    • FEA Confirmation 

Manufacturing Specification 

    • Confirm Laminate Schedule 
    • Part Handling 
    • Cost confirmation 
    • Finishing Specification 
    • Packaging Specification 

Production 

    • Customer order 
    • Inspection regime 
    • Compliance certification 
    • Compliance audit 
    • Delivery 

Assembly 

    • Assembly specification 
    • Component schedule 
    • Assembly cost confirmation 
    • Packaging source 

Storage 

    • Space requirements 
    • Access frequency 

Distribution 

    • Select carriers 
    • Insurances 
    • Scheduling 
    • Labeling 
    • Logistics 
    • Systems Integration 
    • Tracking Delivery Confirmations 