Skymapper 6.5m Dome Test Assembly (November 2006)

posted Nov 30, 2010, 1:22 AM by Chris Ryman   [ updated Sep 29, 2013, 2:04 AM by Chris Ryman ]
The main parts of the 6.5m Skymapper Dome have been manufactured and as part of the QA proceeding (following drilling to our CNC cut jigs) we are required to make a test assembly. Lifting the parts into place and checking alignment was well underway when this picture was taken. There is a 2.5 tonne 6 metre mast Forklift parked inside the dome.